gstack 1.91.24.0 keeps cancelled PR eval work and caps stuck CI runs

1 month ago

What changed in gstack 1.91.24.0: a cancelled PR eval run now hands its finished results to the next push, PR evals run only the paid cases a change can affect, stuck paid shards end at a per-runner ceiling, and a weekly report names flaky and slow free tests. Skill behavior is unchanged; /cso contained runtime and scanner runs are not available yet.

Ask about this presentation

Chapters

  1. 0:00Cancelled runs keep their work
  2. 0:15Narrower PR selection
  3. 0:29Per-runner ceilings
  4. 0:39Weekly test health
  5. 0:50Three CI fixes
  6. 1:02/cso not available yet
Show transcript
  1. In gstack 1.91.24.0, a cancelled pull request eval run hands its finished passes and failures to the next push. So a re-push re-runs only what changed. Skills behave exactly as before.

    Slide text
    gstack logo

    gstack 1.91.24.0 keeps a cancelled PR eval run's finished work

    1.91.22.0
    0 results

    handed to the next push

    1.91.24.0
    Every finished shard

    failures included

    Reuse Selection Ceilings Health Fixes /cso
    garrytan/gstack · CHANGELOG.md
  2. Pull request evals now run only the paid gate cases a change can affect, traced through imports, bin names and build outputs. Edits to shared inputs, such as package.json or the CI image, still run the full gate.

    Slide text

    PR evals run only the paid cases a change can affect

    Mapped to their cases

    Free tests, free fixtures, free-only workflows, and files traced through imports and build outputs

    Still the full gate

    package.json, the CI image, setup, the eval policy

    Reuse Selection Ceilings Health Fixes /cso
    garrytan/gstack · CHANGELOG.md
  3. Every paid lane now has a ceiling sized to its runner. A stuck shard ends as an honest timeout, or as not run, instead of holding a runner for four hours.

    Slide text

    A stuck paid shard ends as TIMEOUT instead of holding a runner for four hours

    254 34–82

    minutes, gate census job ceiling per slice

    Reuse Selection Ceilings Health Fixes /cso
    garrytan/gstack · CHANGELOG.md
  4. A new weekly test health report runs every Monday. It lists free tests that turn flaky, failing in more than five percent of main runs, and tests that are getting slow.

    Slide text

    A weekly report names the free tests that are getting flaky or slow

    bun run test:health Mondays, on main
    flaky fails in over 5% of main runs
    Reuse Selection Ceilings Health Fixes /cso
    garrytan/gstack · CHANGELOG.md
  5. A branch dispatch can no longer cancel main's weekly census. Windows free tests finish in under five minutes instead of eight. And every zsh portability test now runs in CI.

    Slide text

    The weekly census survives branch dispatches, and Windows tests finish sooner

    Weekly censusA branch dispatch can no longer cancel main's census
    Windows free lane8.1 min on one runner, now about 4.6 min on six
    zsh portability testsAbout 42 skipped zsh arms now all run in CI
    Reuse Selection Ceilings Health Fixes /cso
    garrytan/gstack · CHANGELOG.md
  6. The /cso docs now say contained runtime and scanner runs are not available yet. Zero runtime profiles are qualified, and the scanner catalog is empty. The full notes for this release are in the changelog.

    Slide text

    /cso contained runtime and scanner runs are not available yet

    CHANGELOG.md Full 1.91.24.0 notes, with the retired scripts and their replacements
    Reuse Selection Ceilings Health Fixes /cso
    garrytan/gstack · CHANGELOG.md

What happened in AI today, in your inbox

One short email each evening. Read it and you’re caught up.

Built with ❤️ in New York